PEMB and Pool Engineering →

PEMB foundation and pool structural engineering

Foundation designs for pre-engineered metal buildings and structural designs for swimming pools, prepared from the building supplier's reactions, pool layout and site soils. Every anchor bolt, footing and reinforcing bar is detailed for permit and construction.

Send your plans

See what you receive →

2

Specialty services

6

Design scopes

7

Client types served

5

Steps on every project

Design clarity →

A metal building is only as sound as the foundation under it

AM designs PEMB foundations from the supplier's actual column reactions, and pool shells from the actual soil and water loads.

A foundation you have to guess at

What a generic detail leaves open

? Were the footings sized for the supplier's uplift and thrust reactions?

? Do the anchor bolts match the base plate drawings?

? Is the pool shell designed for empty-pool soil pressure?

? Which soil bearing value was assumed?

? Who checked the pool wall where it meets the deck or a retaining wall?

A design you can check

What AM Engineering delivers

✓ Footings designed from the supplier's column reactions

✓ Anchor bolt layout matched to the metal building drawings

✓ Pool shell reinforcement sized for soil, water and surcharge loads

✓ Soil values and assumptions stated on the drawings

✓ Calculations that match the drawing set

What we design →

Six specialty scopes for metal buildings and pools

From the slab under a steel building to the shell of an in-ground pool.

PEMB foundations

Spread footings, piers and grade beams designed for column reactions, uplift and lateral thrust.

Anchor bolt plans

Anchor bolt layouts, embedment and projection matched to the building supplier's base plates.

Slabs and hairpins

Slab on grade design with hairpins or tie rods to resist frame thrust where required.

In-ground pools

Concrete and shotcrete pool shells with wall and floor reinforcement detailed.

Pool walls and beams

Bond beams, raised walls, spas and steps designed with the shell.

Pool site conditions

Designs for sloped sites, nearby foundations, retaining walls and high water tables. [Confirm scope]

How it works →

From reactions to a checked foundation in five steps

Every PEMB and pool assignment follows the same review path.

1

Send your files

Metal building reaction drawings or pool layout, site address and geotechnical report.

2

We confirm criteria

Code edition, soil values, frost depth, wind and seismic loads, and deliverables.

3

We design

Footings, anchor bolts, slabs and pool shell reinforcement are calculated and drafted.

4

We check

Reactions, bolt layouts and reinforcement are checked against the supplier and pool drawings.

5

You receive the package

Foundation or pool structural drawings and calculations. [Confirm PE stamp]

Supplier revisions

When the building supplier revises reactions or the pool layout changes, the design is updated with a record of what changed.

Accepted inputs

Metal building reaction and anchor bolt drawings, pool plans, surveys and geotechnical reports.

What you receive →

What every PEMB and pool package includes

Drawings and calculations ready for permit submission and for the concrete contractor.

The foundation or pool package

✓ Foundation plan with footing and pier schedule

✓ Anchor bolt plan matched to the building supplier

✓ Pool shell plan, sections and reinforcement details

✓ General notes with soil values and design criteria

✓ Structural calculations report

Built from supplier data

Column reactions and base plate details come from your metal building supplier's drawings.

Soils stated

Bearing values and assumptions are written on the drawings for the reviewer.

Delivery format [To confirm]

Add file formats here (for example PDF sheets, DWG files, calculation report).

See a sample foundation set

Show buyers a redacted PEMB or pool sample before they send plans. [Add sample file]

Who it's for →

PEMB and pool engineering shaped to your project

Seven client types building metal structures and pools. Each gets drawings shaped to how they build or submit.

Metal building suppliers

Foundation designs for the buildings you sell

Footing and pier design, anchor bolt plans, slab design

Steel building erectors

A foundation that matches the building on the truck

Anchor bolt layouts, footing schedules, field questions answered

General contractors

Permit-ready foundation drawings

PEMB foundations, slabs, plan review responses

Pool builders

Structural pool designs for permit

Shell reinforcement, bond beams, spas and raised walls

Homeowners

Engineering for a backyard pool or metal garage

Pool structural drawings, metal garage foundations

Owners and developers

Warehouses, shops and agricultural buildings

PEMB foundations, slabs, anchor bolt plans

Architects and designers

Specialty structures coordinated with your set

Foundation and pool details, calculations

Why AM Engineering →

Built around the supplier's real numbers

Seven habits that run through every PEMB and pool package.

Real reactions

Footings are designed from the supplier's column reactions, not a generic rule of thumb

Bolts that match

Anchor bolt layouts are checked against the metal building base plate drawings

Thrust resisted

Frame thrust is resisted with hairpins, tie rods or footings, and the method is shown

Empty pool checked

Pool walls are designed for soil pressure with the pool empty, not only full

Soils on the sheets

Bearing values and assumptions are written on the drawings

Assumptions on record

Missing supplier or soil data is listed as a stated assumption

Revision record

Supplier changes are tracked so the foundation always matches the current building

FAQ →

PEMB and pool engineering questions

Reactions, soils, stamps and turnaround.

What do you need from the metal building supplier?

The reaction drawings with column loads and the anchor bolt or base plate drawings.

Do you design the metal building itself?

No. The building supplier engineers the steel frame. AM designs the foundation that supports it.

Do I need a geotechnical report?

It is recommended. Without one, presumptive soil values are used and listed as an assumption.

Can you design a pool on a slope or near a house?

Yes. Surcharge from nearby foundations and sloped ground is included in the design.

Do you stamp the drawings? [To confirm]

Add the states where AM's engineers hold a PE license.

How long does a PEMB foundation design take? [To confirm]

Add the typical turnaround for PEMB and pool projects.

How is this priced? [To confirm]

Add the pricing basis, for example a fixed fee per building or per pool.

Still have questions?

Send your supplier drawings or pool plans and tell us what you need.

Send your plans

Estimating

Construction Cost Estimating

Quantity Takeoff

Commercial Estimating

Residential Estimating

Public Bid Estimating

Trades

Concrete

Rebar

Structural Steel

MEP

All trades

Company

About

Privacy policy

Terms of service

Construction estimating, takeoff and engineering services for contractors, owners, manufacturers and suppliers across the USA.

AM Engineering Group

© 2026 AM Engineering Group. All rights reserved.